RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1411015884 - Archived data from Mon, 25. November 2019 17:13:54 CET


This is all the information about APD 1411015884. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1411015884
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum Box 38
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D07
Break-through voltage: 416 V
Voltage for Gain 100 (T=+25°C): 387.7 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 38
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 392
Position in grid: 19
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:31:08 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:55 CEST jreher Updated box and position via API.
05. Feb 2021 10:53:07 CET jreher Updated box and position via API.
03. Feb 2021 18:18:52 CET jreher Updated box and position via API.
11. Aug 2020 17:25:53 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:35:42 CET jreher Updated APD location via API.
25. Nov 2019 17:13:54 CET jreher Updated box and position via API.
04. Jul 2019 11:10:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:15 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:11 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:24:55 CET markus.moritz Entered shipped after irradiation date.
03. Dec 2018 14:31:41 CET markus.moritz
29. Sep 2017 13:37:44 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:26 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:39:43 CEST Tobias Imported from Hamamatsu datasheet.