Show Hamamatsu Avalanche Photo Diode 1411015876 - Archived data from Wed, 03. February 2021 18:18:51 CET
					This is all the information about APD 1411015876. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1411015876 | 
| Type: | Hamamatsu Avalanche Photo Diode | 
| Detector: | unassigned | 
| Unit: | unassigned | 
| Preamp: | 0 | 
| Current location: | Bochum | 
| Installation information: | |
| Label: | none | 
| Manufacturer information: | |
| Wafer position: | C07 | 
| Break-through voltage: | 419 V | 
| Voltage for Gain 100 (T=+25°C): | 389.9 V | 
| Dark current: | 5.7 nA | 
| Screening Logistics: | |
| Available: | Yes | 
| Storage Box: | 38 | 
| Position in Box: | 19 | 
| EP1 batch: | none | 
| EP1 batch after irradiation: | none | 
| Shipment: | |
| Grid number: | 392 | 
| Position in grid: | 11 | 
| Arrival for irradiation: | 29. Sep 2017 | 
| Sent for analysis after irradiation: | 16. Jan 2019 | 
| Return for assembly: | none | 
| Irradiation: | |
| Date: | 29. Nov 2018 | 
| Dose used: | 37 Gy | 
| Temperature: | 20 °C | 
| Position: | none | 
| Bias voltage: | none | 
| Annealing: | |
| Date: | 30. Nov 2018 | 
| Temperature: | 80 °C | 
| Duration: | 48 h | 
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 390.4580558 V T = -25 °C: 354.0631735 V | 
| Voltage for Gain 150: | T = +20 °C: 398.4113446 V T = -25 °C: 361.6794682 V | 
| Voltage for Gain 200: | T = +20 °C: 402.8256579 V T = -25 °C: 365.9713838 V | 
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.429717585 V-1 T = -25 °C: 4.68971292 V-1 | 
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.127383882 V-1 T = -25 °C: 8.858718433 V-1 | 
| Gain/Voltage slope at M = 200: | T = +20 °C: 14.50477574 V-1 T = -25 °C: 14.05990627 V-1 | 
| Break-through voltage: | T = +20 °C: 418.1894514 V T = -25 °C: 381.4438643 V | 
| Notes: | 
						
					
Version history
| Time | Author | Change comment | 
|---|---|---|
| 05. Feb 2021 10:53:06 CET | jreher | Updated box and position via API. | 
| 03. Feb 2021 18:18:51 CET | jreher | Updated box and position via API. | 
| 11. Aug 2020 17:25:52 CEST | jreher | Updated APD characteristics via API. | 
| 27. Nov 2019 19:35:42 CET | jreher | Updated APD location via API. | 
| 25. Nov 2019 17:13:53 CET | jreher | Updated box and position via API. | 
| 04. Jul 2019 11:10:46 CEST | jreher | Updated APD location via API. | 
| 12. Jun 2019 16:48:14 CEST | jreher | Updated APD batch assignment via API. | 
| 12. Jun 2019 16:33:10 CEST | jreher | Updated APD batch assignment via API. | 
| 18. Jan 2019 14:24:55 CET | markus.moritz | Entered shipped after irradiation date. | 
| 03. Dec 2018 14:34:21 CET | markus.moritz | |
| 29. Sep 2017 13:37:44 CEST | markus.moritz | Entered arrival for irradiation date. | 
| 01. Aug 2016 17:29:26 CEST | Tobias | Assigned to grid via information extracted from APD DB. | 
| 23. Jun 2016 10:39:42 CEST | Tobias | Imported from Hamamatsu datasheet. | 
 
						 
					