RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1319014951


This is all the information about APD 1319014951. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1319014951
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 449 V
Voltage for Gain 100 (T=+25°C): 420 V
Dark current: 8.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 361
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: 10552
   
Shipment:  
Grid number: 350
Position in grid: 10
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: 29. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 420 V     (not connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.747933 V     T = -25 °C: 383.9613986 V
Voltage for Gain 150: T = +20 °C: 428.7524288 V     T = -25 °C: 391.8936302 V
Voltage for Gain 200: T = +20 °C: 433.2088604 V     T = -25 °C: 396.3091973 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.551707454 V-1     T = -25 °C: 4.524286251 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.994833158 V-1     T = -25 °C: 8.981068603 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.78625144 V-1     T = -25 °C: 13.79180982 V-1
Break-through voltage: T = +20 °C: 439.9393224 V     T = -25 °C: 412.3087221 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Apr 2021 22:01:39 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:34:36 CET jreher Updated box and position via API.
08. Oct 2020 18:16:20 CEST jreher Updated APD location via API.
08. Sep 2020 17:08:36 CEST vwerner Updated APD batch assignment via API.
12. Dec 2017 22:43:24 CET yannik.bettner Entered irradiation information.
02. Nov 2017 15:18:58 CET markus.moritz Entered arrival for irradiation date.
27. Oct 2017 10:23:25 CEST Tobias Resetted arrival for irradiation date as APDs are returned to GSI un-irradiated.
29. Sep 2017 12:33:30 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:58 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:50 CEST Tobias Imported from Hamamatsu datasheet.