RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1315014666 - Archived data from Wed, 07. October 2020 15:45:56 CEST


This is all the information about APD 1315014666. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1315014666
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E02
Break-through voltage: 435 V
Voltage for Gain 100 (T=+25°C): 406.8 V
Dark current: 8.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 35
Position in Box: 20
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 338
Position in grid: 7
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 407.4494356 V     T = -25 °C: 370.5131956 V
Voltage for Gain 150: T = +20 °C: 415.3832962 V     T = -25 °C: 378.4233674 V
Voltage for Gain 200: T = +20 °C: 419.8111445 V     T = -25 °C: 382.8150104 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.268331721 V-1     T = -25 °C: 4.481057458 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.805711068 V-1     T = -25 °C: 8.6193341 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.59562474 V-1     T = -25 °C: 13.35047496 V-1
Break-through voltage: T = +20 °C: 434.9019306 V     T = -25 °C: 398.1187329 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:27 CET jreher Updated box and position via API.
03. Feb 2021 18:18:28 CET jreher Updated box and position via API.
07. Oct 2020 15:45:56 CEST jreher Updated APD location via API.
11. Aug 2020 17:25:22 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:49 CET jreher Updated APD location via API.
25. Nov 2019 17:13:38 CET jreher Updated box and position via API.
13. Jun 2019 11:29:29 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:01 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:56 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 13:19:40 CET markus.moritz
29. Sep 2017 10:21:51 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:49 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:29:43 CEST Tobias Imported from Hamamatsu datasheet.