RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1313014505 - Archived data from Tue, 11. August 2020 17:40:34 CEST


This is all the information about APD 1313014505. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1313014505
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C13
Break-through voltage: 446 V
Voltage for Gain 100 (T=+25°C): 418.2 V
Dark current: 10.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 35
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 331
Position in grid: 6
Arrival for irradiation: 11. Aug 2016
Sent for analysis after irradiation: 02. Sep 2016
Return for assembly: 06. Oct 2016
   
Irradiation:  
Date: 23. Aug 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 2
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 24. Aug 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 420.0868995 V     T = -25 °C: 382.6905253 V
Voltage for Gain 150: T = +20 °C: 428.10713 V     T = -25 °C: 390.6741538 V
Voltage for Gain 200: T = +20 °C: 432.5783954 V     T = -25 °C: 395.1291637 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.459685438 V-1     T = -25 °C: 4.294095645 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.52183287 V-1     T = -25 °C: 9.08769984 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.54510323 V-1     T = -25 °C: 14.09957151 V-1
Break-through voltage: T = +20 °C: 439.9979313 V     T = -25 °C: 411.1586028 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:52 CET jreher Updated box and position via API.
07. Oct 2020 15:44:54 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:34 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:53 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:02 CET jreher Updated APD location via API.
25. Nov 2019 17:31:34 CET jreher Updated box and position via API.
22. Oct 2019 14:32:46 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:38 CEST jgrochowski Updated APD batch assignment via API.
06. Oct 2016 09:31:06 CEST markus.moritz Entered return for assembly date.
08. Sep 2016 13:36:00 CEST markus.moritz Entered shipped after irradiation date.
24. Aug 2016 14:40:44 CEST christopher.l.hahn Entered irradiation information.
24. Aug 2016 14:24:03 CEST christopher.l.hahn Entered annealing information.
11. Aug 2016 11:43:57 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:45 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:36 CEST Tobias Imported from Hamamatsu datasheet.