RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1310014246 - Archived data from Wed, 07. October 2020 15:44:54 CEST


This is all the information about APD 1310014246. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1310014246
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E10
Break-through voltage: 438 V
Voltage for Gain 100 (T=+25°C): 409.7 V
Dark current: 8.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 291
Position in Box: 33
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 320
Position in grid: 3
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 02. Nov 2016
Return for assembly: 29. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 410.2405746 V     T = -25 °C: 373.3262567 V
Voltage for Gain 150: T = +20 °C: 418.2083782 V     T = -25 °C: 381.1951542 V
Voltage for Gain 200: T = +20 °C: 422.6187234 V     T = -25 °C: 385.5637043 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.418439316 V-1     T = -25 °C: 4.45618778 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.627391378 V-1     T = -25 °C: 8.751738733 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.01769011 V-1     T = -25 °C: 15.28392549 V-1
Break-through voltage: T = +20 °C: 437.9948813 V     T = -25 °C: 401.0134667 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:52 CET jreher Updated box and position via API.
07. Oct 2020 15:44:54 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:53 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:02 CET jreher Updated APD location via API.
25. Nov 2019 17:31:34 CET jreher Updated box and position via API.
22. Oct 2019 14:32:46 CEST spankonin Updated APD location via API.
15. Oct 2019 11:00:38 CEST jgrochowski Updated APD batch assignment via API.
29. Nov 2016 11:52:50 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:30:52 CET markus.moritz Entered shipped after irradiation date.
02. Nov 2016 14:18:25 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:06:04 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:37 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:42:30 CEST Tobias Imported from Hamamatsu datasheet.