RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1305013892


This is all the information about APD 1305013892. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1305013892
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B12
Break-through voltage: 450.6 V
Voltage for Gain 100 (T=+25°C): 422.7 V
Dark current: 10.3 nA
   
Screening Logistics:  
Available: No
Storage Box: 289
Position in Box: 46
EP1 batch: none
EP1 batch after irradiation: 10767
   
Shipment:  
Grid number: 799
Position in grid: 6
Arrival for irradiation: 27. Oct 2016
Sent for analysis after irradiation: 03. Oct 2016
Return for assembly: 23. Nov 2016
   
Irradiation:  
Date: 31. Oct 2016
Dose used: 30 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 423.3000521 V     T = -25 °C: 386.7006649 V
Voltage for Gain 150: T = +20 °C: 431.16737 V     T = -25 °C: 394.518903 V
Voltage for Gain 200: T = +20 °C: 435.5388337 V     T = -25 °C: 398.8469935 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.488127708 V-1     T = -25 °C: 4.378816927 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.865822321 V-1     T = -25 °C: 8.64533952 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.59572752 V-1     T = -25 °C: 15.04618951 V-1
Break-through voltage: T = +20 °C: 449.1198856 V     T = -25 °C: 414.3497477 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
28. Jul 2022 13:17:49 CEST oafedulidis Updated box and position via API.
28. Jul 2022 13:15:12 CEST oafedulidis Updated APD location via API.
08. Mar 2022 14:29:53 CET oafedulidis Updated APD characteristics via API.
08. Mar 2022 13:54:16 CET oafedulidis Updated APD batch assignment via API.
28. Feb 2022 15:57:50 CET oafedulidis Updated APD batch assignment via API.
24. Feb 2022 08:35:51 CET oafedulidis Updated APD location via API.
24. Feb 2022 08:35:30 CET oafedulidis Updated APD batch assignment via API.
05. Feb 2021 11:25:37 CET jreher Updated box and position via API.
07. Oct 2020 15:44:50 CEST jreher Updated APD location via API.
11. Aug 2020 17:40:16 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:40:33 CEST jreher Updated box and position via API.
27. Nov 2019 20:18:41 CET jreher Updated APD location via API.
25. Nov 2019 17:31:25 CET jreher Updated box and position via API.
22. Oct 2019 14:31:16 CEST spankonin Updated APD location via API.
14. Oct 2019 17:31:22 CEST jgrochowski Updated APD batch assignment via API.
05. Apr 2018 13:59:37 CEST jgrochowski
29. Nov 2016 11:50:58 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:32:15 CET markus.moritz Entered return for assembly date.
02. Nov 2016 14:29:51 CET markus.moritz Entered shipped after irradiation date.
31. Oct 2016 11:51:45 CET markus.moritz Entered irradiation information.
27. Oct 2016 12:07:44 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:26 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:41:00 CEST Tobias Imported from Hamamatsu datasheet.