RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1304013781


This is all the information about APD 1304013781. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1304013781
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen (mounted in Slice)
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E01
Break-through voltage: 443 V
Voltage for Gain 100 (T=+25°C): 414.5 V
Dark current: 5.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 293
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: 10207
   
Shipment:  
Grid number: 298
Position in grid: 17
Arrival for irradiation: 11. Aug 2016
Sent for analysis after irradiation: 02. Sep 2016
Return for assembly: 06. Oct 2016
   
Irradiation:  
Date: 23. Aug 2016
Dose used: 30 Gy
Temperature: 25 °C
Position: 1
Bias voltage: 350 V     (connected)
   
Annealing:  
Date: 24. Aug 2016
Temperature: 80 °C
Duration: 10 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 416.1412758 V     T = -25 °C: 378.8252476 V
Voltage for Gain 150: T = +20 °C: 424.1266927 V     T = -25 °C: 386.7808347 V
Voltage for Gain 200: T = +20 °C: 428.5631148 V     T = -25 °C: 391.2009152 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461565208 V-1     T = -25 °C: 4.603087864 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.676315695 V-1     T = -25 °C: 9.045929718 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.15238637 V-1     T = -25 °C: 13.97630047 V-1
Break-through voltage: T = +20 °C: 439.9448639 V     T = -25 °C: 406.3487992 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
17. Apr 2021 01:10:34 CEST jreher Updated APD location via API.
05. Feb 2021 11:26:04 CET jreher Updated box and position via API.
11. Aug 2020 17:40:47 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:09 CEST jreher Updated box and position via API.
27. Nov 2019 20:19:21 CET jreher Updated APD location via API.
25. Nov 2019 17:31:40 CET jreher Updated box and position via API.
11. Nov 2019 15:43:02 CET spankonin Updated APD location via API.
15. Oct 2019 10:59:39 CEST jgrochowski Updated APD batch assignment via API.
06. Oct 2016 09:44:15 CEST markus.moritz Entered return for assembly date.
08. Sep 2016 13:35:37 CEST markus.moritz Entered shipped after irradiation date.
24. Aug 2016 14:40:03 CEST christopher.l.hahn Entered irradiation information.
24. Aug 2016 14:23:22 CEST christopher.l.hahn Entered annealing information.
11. Aug 2016 11:46:07 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:23 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:47 CEST Tobias Imported from Hamamatsu datasheet.