RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1301013568


This is all the information about APD 1301013568. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1301013568
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum not processed
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 445 V
Voltage for Gain 100 (T=+25°C): 416.7 V
Dark current: 11.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 288
Position in grid: 10
Arrival for irradiation: 02. Nov 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 03. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 416.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
26. May 2021 16:05:34 CEST jreher Updated APD location via API.
03. Feb 2021 18:07:06 CET jreher Updated APD location via API.
03. Nov 2017 16:15:03 CET markus.moritz Entered shipped after irradiation date.
03. Nov 2017 16:14:08 CET markus.moritz Entered irradiation information.
02. Nov 2017 15:17:57 CET markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:28:16 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:39:42 CEST Tobias Imported from Hamamatsu datasheet.