RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0817008482 - Archived data from Fri, 16. April 2021 22:00:55 CEST


This is all the information about APD 0817008482. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0817008482
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 403 V
Voltage for Gain 100 (T=+25°C): 374.8 V
Dark current: 3.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 355
Position in Box: 34
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 78
Position in grid: 3
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 374.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 374.9490522 V     T = -25 °C: 340.108 V
Voltage for Gain 150: T = +20 °C: 382.782957 V     T = -25 °C: 347.3171733 V
Voltage for Gain 200: T = +20 °C: 387.1523892 V     T = -25 °C: 351.37148 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.65163873 V-1     T = -25 °C: 5.006445507 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.172036439 V-1     T = -25 °C: 9.396096338 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26083968 V-1     T = -25 °C: 14.91823228 V-1
Break-through voltage: T = +20 °C: 402.8728552 V     T = -25 °C: 366.4981787 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:46:46 CEST oafedulidis Updated box and position via API.
16. Apr 2021 22:00:55 CEST jreher Updated APD characteristics via API.
05. Feb 2021 11:33:52 CET jreher Updated box and position via API.
08. Oct 2020 18:15:14 CEST jreher Updated APD location via API.
17. Aug 2020 14:26:34 CEST vwerner Updated APD batch assignment via API.
23. Aug 2017 15:53:23 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:11:33 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:55:57 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:50:11 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:14 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:52 CEST Tobias Imported from Hamamatsu datasheet.