RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0815008392 - Archived data from Tue, 11. August 2020 17:58:55 CEST


This is all the information about APD 0815008392. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0815008392
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D15
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 384.7 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 310
Position in Box: 44
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 62
Position in grid: 0
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 10. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 08. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 384.7 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.8711674 V     T = -25 °C: 348.8883984 V
Voltage for Gain 150: T = +20 °C: 392.8370497 V     T = -25 °C: 356.3882705 V
Voltage for Gain 200: T = +20 °C: 397.2691495 V     T = -25 °C: 360.6059259 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.562491032 V-1     T = -25 °C: 4.888502852 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.945332544 V-1     T = -25 °C: 8.939189064 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84041218 V-1     T = -25 °C: 15.64494002 V-1
Break-through voltage: T = +20 °C: 413.1481553 V     T = -25 °C: 376.4001573 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:28:30 CET jreher Updated box and position via API.
11. Aug 2020 17:58:55 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:25 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:16 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:53 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:10 CET jreher Updated box and position via API.
10. Aug 2017 15:15:20 CEST hans-georg.zaunick Entered shipped after irradiation date.
08. Aug 2017 17:55:24 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:53:28 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:44:17 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:01 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:27:50 CEST Tobias Imported from Hamamatsu datasheet.