Show Hamamatsu Avalanche Photo Diode 0811008067 - Archived data from Tue, 11. August 2020 17:35:12 CEST
This is all the information about APD 0811008067. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 0811008067 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | E12 |
| Break-through voltage: | 421 V |
| Voltage for Gain 100 (T=+25°C): | 392.9 V |
| Dark current: | 6.9 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 192 |
| Position in Box: | 29 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 18. Apr 2019 |
| Sent for analysis after irradiation: | 29. Jul 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 25. Jul 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 27. Jul 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 393.1865857 V T = -25 °C: 356.7664842 V |
| Voltage for Gain 150: | T = +20 °C: 401.0663352 V T = -25 °C: 364.4425983 V |
| Voltage for Gain 200: | T = +20 °C: 405.4378987 V T = -25 °C: 368.7246637 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.503112308 V-1 T = -25 °C: 4.797063705 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 8.780684951 V-1 T = -25 °C: 9.546190924 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 15.31510151 V-1 T = -25 °C: 14.94078234 V-1 |
| Break-through voltage: | T = +20 °C: 420.8180017 V T = -25 °C: 384.2035689 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 15. Nov 2022 12:52:43 CET | oafedulidis | Assigned to capsule by script |
| 09. Dec 2021 13:11:01 CET | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 11:13:08 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:35:12 CEST | jreher | Updated APD characteristics via API. |
| 27. Nov 2019 20:03:02 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:26:01 CET | jreher | Updated box and position via API. |
| 16. Aug 2019 12:20:37 CEST | jreher | Updated APD location via API. |
| 09. Aug 2019 16:25:49 CEST | jreher | Updated APD batch assignment via API. |
| 07. Aug 2019 14:58:01 CEST | markus.moritz | |
| 22. Jun 2016 15:26:16 CEST | Tobias | Imported from Hamamatsu datasheet. |