RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035965 - Archived data from Fri, 05. February 2021 11:07:29 CET


This is all the information about APD 3310035965. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035965
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 386.1 V
Dark current: 31 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 149
Position in Box: 22
EP1 batch: 174
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.6531422 V     T = -25 °C: 351.4124143 V
Voltage for Gain 150: T = +20 °C: 394.4101497 V     T = -25 °C: 358.7175714 V
Voltage for Gain 200: T = +20 °C: 398.7116634 V     T = -25 °C: 362.8090228 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.452347903 V-1     T = -25 °C: 4.827012138 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.76158291 V-1     T = -25 °C: 9.920098407 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.40440437 V-1     T = -25 °C: 15.90294866 V-1
Break-through voltage: T = +20 °C: 412.8045752 V     T = -25 °C: 376.9581121 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:40:26 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:14 CEST jreher Updated box and position via API.
05. Feb 2021 11:07:29 CET jreher Updated box and position via API.
11. Aug 2020 18:01:50 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:56 CEST jreher Updated APD location via API.
03. Feb 2020 14:25:22 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:08 CET jreher Updated APD location via API.
27. Nov 2019 19:55:10 CET jreher Updated APD location via API.
25. Nov 2019 17:22:40 CET jreher Updated box and position via API.
26. Sep 2019 15:34:31 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:17 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:28 CEST Tobias Imported from Hamamatsu datasheet.