RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3310035952 - Archived data from Fri, 05. February 2021 11:07:28 CET


This is all the information about APD 3310035952. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3310035952
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H09
Break-through voltage: 413 V
Voltage for Gain 100 (T=+25°C): 385 V
Dark current: 35.2 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 149
Position in Box: 10
EP1 batch: 174
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8293052 V     T = -25 °C: 350.6428734 V
Voltage for Gain 150: T = +20 °C: 393.6249594 V     T = -25 °C: 357.9743467 V
Voltage for Gain 200: T = +20 °C: 397.9637357 V     T = -25 °C: 362.1049864 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.694720343 V-1     T = -25 °C: 4.71717413 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.304599837 V-1     T = -25 °C: 9.524630107 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.52691741 V-1     T = -25 °C: 15.02297673 V-1
Break-through voltage: T = +20 °C: 412.0955664 V     T = -25 °C: 376.1398993 V
   
Notes:


Version history

Time Author Change comment
19. May 2022 15:27:37 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:46 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:07:28 CET jreher Updated box and position via API.
11. Aug 2020 18:01:48 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:51:55 CEST jreher Updated APD location via API.
30. Jan 2020 14:06:16 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:49:07 CET jreher Updated APD location via API.
27. Nov 2019 19:55:09 CET jreher Updated APD location via API.
25. Nov 2019 17:22:39 CET jreher Updated box and position via API.
26. Sep 2019 15:34:30 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:56:02 CEST jreher Updated APD location via API.
03. Jan 2019 00:15:16 CET Tobias Corrected dark current unit.
19. Sep 2018 14:05:28 CEST Tobias Imported from Hamamatsu datasheet.