RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0807007707 - Archived data from Tue, 11. August 2020 17:56:46 CEST


This is all the information about APD 0807007707. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0807007707
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G09
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.3 V
Dark current: 3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 298
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 91
Position in grid: 12
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 16. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Aug 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 387.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.9522357 V     T = -25 °C: 351.3487964 V
Voltage for Gain 150: T = +20 °C: 394.8494181 V     T = -25 °C: 358.8350435 V
Voltage for Gain 200: T = +20 °C: 399.2438852 V     T = -25 °C: 363.0420106 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.55420299 V-1     T = -25 °C: 4.697755688 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.957128349 V-1     T = -25 °C: 9.404578586 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.84270198 V-1     T = -25 °C: 14.6572938 V-1
Break-through voltage: T = +20 °C: 414.5024482 V     T = -25 °C: 378.5175216 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:26:42 CET jreher Updated box and position via API.
11. Aug 2020 17:56:46 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:15 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:32 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:34 CET jreher Updated box and position via API.
23. Aug 2017 16:05:03 CEST markus.moritz Entered shipped after irradiation date.
10. Aug 2017 15:09:14 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:57:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:15:20 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:24:36 CEST Tobias Imported from Hamamatsu datasheet.