RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3205034914


This is all the information about APD 3205034914. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3205034914
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 3205034914/3003033392
Unit: #2811 (barcode 1309023615)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: D10
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.3 V
Dark current: 21.5 nA
   
Screening Logistics:  
Available: No
Storage Box: 135
Position in Box: 38
EP1 batch: 154
EP1 batch after irradiation: 10475
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.2226232 V     T = -25 °C: 346.2267272 V
Voltage for Gain 150: T = +20 °C: 389.1046025 V     T = -25 °C: 353.505132 V
Voltage for Gain 200: T = +20 °C: 393.5469618 V     T = -25 °C: 357.6279069 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.231950434 V-1     T = -25 °C: 4.930691533 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.090077586 V-1     T = -25 °C: 9.134406025 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.82535156 V-1     T = -25 °C: 16.31468738 V-1
Break-through voltage: T = +20 °C: 409.5373393 V     T = -25 °C: 373.0920446 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
27. Oct 2021 14:25:10 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 16:57:56 CEST jreher Updated box and position via API.
05. Feb 2021 11:05:45 CET jreher Updated box and position via API.
11. Aug 2020 18:08:19 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:50:57 CEST jreher Updated APD location via API.
09. Mar 2020 17:39:02 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:48:19 CET jreher Updated APD location via API.
27. Nov 2019 19:52:39 CET jreher Updated APD location via API.
25. Nov 2019 17:21:37 CET jreher Updated box and position via API.
20. Sep 2019 18:43:38 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:54:18 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:54 CET Tobias Corrected dark current unit.
14. Aug 2018 16:04:18 CEST Tobias Imported from Hamamatsu datasheet.