Show Hamamatsu Avalanche Photo Diode 3009033790 - Archived data from Tue, 11. August 2020 18:07:20 CEST


This is all the information about APD 3009033790. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033790
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E03
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.9 V
Dark current: 20.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 20
EP1 batch: 128
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.955242 V     T = -25 °C: 352.8593735 V
Voltage for Gain 150: T = +20 °C: 396.7736478 V     T = -25 °C: 360.3545555 V
Voltage for Gain 200: T = +20 °C: 401.1064179 V     T = -25 °C: 364.549813 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.674376187 V-1     T = -25 °C: 4.863998711 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.235504798 V-1     T = -25 °C: 8.946837497 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.5409614 V-1     T = -25 °C: 15.68284897 V-1
Break-through voltage: T = +20 °C: 415.7855305 V     T = -25 °C: 379.3745954 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:03:44 CET jreher Updated box and position via API.
11. Aug 2020 18:07:20 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:46 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:48 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:20 CET jreher Updated APD location via API.
27. Nov 2019 19:49:44 CET jreher Updated APD location via API.
25. Nov 2019 17:20:22 CET jreher Updated box and position via API.
30. Aug 2019 11:27:26 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:13 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:29 CET Tobias Corrected dark current unit.
02. Oct 2018 11:31:04 CEST markus.moritz
02. Oct 2018 11:30:23 CEST markus.moritz
26. Sep 2018 10:34:46 CEST markus.moritz
06. Jul 2018 22:38:52 CEST Tobias Imported from Hamamatsu datasheet.