RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3009033771 - Archived data from Wed, 16. June 2021 15:53:37 CEST


This is all the information about APD 3009033771. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3009033771
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D09
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 20.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 119
Position in Box: 3
EP1 batch: 127
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 24. Jul 2018
Sent for analysis after irradiation: 21. Aug 2018
Return for assembly: none
   
Irradiation:  
Date: 16. Aug 2018
Dose used: 30 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Aug 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.716896 V     T = -25 °C: 350.7152564 V
Voltage for Gain 150: T = +20 °C: 393.5390342 V     T = -25 °C: 358.2235546 V
Voltage for Gain 200: T = +20 °C: 397.8680025 V     T = -25 °C: 362.5350244 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.725894994 V-1     T = -25 °C: 5.029659085 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.549697654 V-1     T = -25 °C: 8.846368456 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.89651983 V-1     T = -25 °C: 15.14757014 V-1
Break-through voltage: T = +20 °C: 414.4185759 V     T = -25 °C: 376.5734705 V
   
Notes: foam


Version history

Time Author Change comment
19. Nov 2021 13:05:37 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:04:41 CEST oafedulidis Updated box and position via API.
16. Jun 2021 16:00:52 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:53:37 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:03:42 CET jreher Updated box and position via API.
11. Aug 2020 18:07:16 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:43 CEST jreher Updated APD location via API.
02. Mar 2020 16:40:46 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:19 CET jreher Updated APD location via API.
27. Nov 2019 19:49:42 CET jreher Updated APD location via API.
25. Nov 2019 17:20:21 CET jreher Updated box and position via API.
30. Aug 2019 11:27:49 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:11 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:28 CET Tobias Corrected dark current unit.
21. Aug 2018 10:40:08 CEST markus.moritz
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.