RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 3008033710 - Archived data from Tue, 11. August 2020 18:07:06 CEST


This is all the information about APD 3008033710. If it is wrong, edit the data.

Subdetector specification:  
Serial: 3008033710
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F05
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 389.6 V
Dark current: 22.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 118
Position in Box: 4
EP1 batch: 126
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.8926536 V     T = -25 °C: 353.0857172 V
Voltage for Gain 150: T = +20 °C: 396.7701872 V     T = -25 °C: 360.5951765 V
Voltage for Gain 200: T = +20 °C: 401.1359508 V     T = -25 °C: 364.7535521 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.569808585 V-1     T = -25 °C: 4.87739216 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.131966569 V-1     T = -25 °C: 9.315084455 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19622663 V-1     T = -25 °C: 15.09960084 V-1
Break-through voltage: T = +20 °C: 416.1727814 V     T = -25 °C: 379.8613007 V
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:18:34 CET oafedulidis Assigned to capsule by script
09. Dec 2021 13:10:30 CET oafedulidis Updated box and position via API.
05. Feb 2021 11:03:34 CET jreher Updated box and position via API.
11. Aug 2020 18:07:06 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:39 CEST jreher Updated APD location via API.
21. Jul 2020 14:33:46 CEST jreher Updated APD batch assignment via API.
21. Jul 2020 14:33:19 CEST jreher Updated APD batch assignment via API.
02. Mar 2020 16:15:18 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:47:15 CET jreher Updated APD location via API.
27. Nov 2019 19:49:31 CET jreher Updated APD location via API.
25. Nov 2019 17:20:16 CET jreher Updated box and position via API.
30. Aug 2019 11:28:09 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:52:04 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:27 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:51 CEST Tobias Imported from Hamamatsu datasheet.