RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2904032702 - Archived data from Fri, 05. February 2021 11:02:27 CET


This is all the information about APD 2904032702. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2904032702
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 410 V
Voltage for Gain 100 (T=+25°C): 381.1 V
Dark current: 6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 109
Position in Box: 38
EP1 batch: 112
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 381.5885481 V     T = -25 °C: 345.9096834 V
Voltage for Gain 150: T = +20 °C: 389.5335945 V     T = -25 °C: 353.2122485 V
Voltage for Gain 200: T = +20 °C: 393.9389754 V     T = -25 °C: 357.4328976 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.671815486 V-1     T = -25 °C: 4.643857728 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.36605775 V-1     T = -25 °C: 10.85003603 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.61241658 V-1     T = -25 °C: 13.74174772 V-1
Break-through voltage: T = +20 °C: 410.1737091 V     T = -25 °C: 373.0594712 V
   
Notes:


Version history

Time Author Change comment
25. Oct 2021 14:14:19 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:08 CEST jreher Updated box and position via API.
05. Feb 2021 11:02:27 CET jreher Updated box and position via API.
11. Aug 2020 18:00:21 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:10 CEST jreher Updated APD location via API.
28. Jan 2020 16:01:08 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:44 CET jreher Updated APD location via API.
28. Nov 2019 12:01:19 CET jreher Updated APD location via API.
25. Nov 2019 17:19:38 CET jreher Updated box and position via API.
23. Aug 2019 12:00:22 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:03 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:13 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:42 CEST Tobias Imported from Hamamatsu datasheet.