RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2903032650 - Archived data from Fri, 05. February 2021 11:02:20 CET


This is all the information about APD 2903032650. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2903032650
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F08
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 379 V
Dark current: 7.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 108
Position in Box: 43
EP1 batch: 111
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.0247711 V     T = -25 °C: 343.8020411 V
Voltage for Gain 150: T = +20 °C: 386.8443681 V     T = -25 °C: 351.1451904 V
Voltage for Gain 200: T = +20 °C: 391.2132558 V     T = -25 °C: 355.2775675 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.621309628 V-1     T = -25 °C: 4.995219669 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.081507721 V-1     T = -25 °C: 9.398123823 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.16270016 V-1     T = -25 °C: 14.76226933 V-1
Break-through voltage: T = +20 °C: 407.1236514 V     T = -25 °C: 370.8252089 V
   
Notes:


Version history

Time Author Change comment
15. Feb 2021 15:39:26 CET jreher Assigned to capsule by script
05. Feb 2021 11:02:20 CET jreher Updated box and position via API.
18. Dec 2020 14:01:05 CET jreher Updated box and position via API.
11. Aug 2020 18:06:24 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:49:06 CEST jreher Updated APD location via API.
25. Feb 2020 17:02:06 CET vwerner Updated APD batch assignment via API.
29. Nov 2019 11:46:41 CET jreher Updated APD location via API.
28. Nov 2019 12:01:16 CET jreher Updated APD location via API.
25. Nov 2019 17:19:33 CET jreher Updated box and position via API.
23. Aug 2019 12:00:03 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:49:59 CEST jreher Updated APD location via API.
03. Jan 2019 00:14:12 CET Tobias Corrected dark current unit.
06. Jul 2018 22:38:41 CEST Tobias Imported from Hamamatsu datasheet.