RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2905032802 - Archived data from Tue, 11. August 2020 17:59:41 CEST


This is all the information about APD 2905032802. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2905032802
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D04
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 384.5 V
Dark current: 7.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 103
Position in Box: 45
EP1 batch: 102
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 384.4278594 V     T = -25 °C: 348.9138035 V
Voltage for Gain 150: T = +20 °C: 392.2774981 V     T = -25 °C: 356.3498652 V
Voltage for Gain 200: T = +20 °C: 396.6373194 V     T = -25 °C: 360.5232697 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.458509649 V-1     T = -25 °C: 4.921332839 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.744575821 V-1     T = -25 °C: 9.093391264 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.30929996 V-1     T = -25 °C: 16.19307503 V-1
Break-through voltage: T = +20 °C: 411.2886309 V     T = -25 °C: 375.3688749 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:01:40 CET jreher Updated box and position via API.
11. Aug 2020 17:59:41 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:48:43 CEST jreher Updated APD location via API.
21. Jul 2020 13:42:33 CEST jreher Updated APD batch assignment via API.
28. Jan 2020 14:54:39 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:46:22 CET jreher Updated APD location via API.
27. Nov 2019 19:46:58 CET jreher Updated APD location via API.
25. Nov 2019 17:19:10 CET jreher Updated box and position via API.
20. Aug 2019 12:48:55 CEST jgrochowski Updated APD batch assignment via API.
05. Jul 2019 13:50:23 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:58 CET Tobias Corrected dark current unit.
20. Jun 2018 13:36:22 CEST Tobias Imported from Hamamatsu datasheet.