RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2708030632 - Archived data from Tue, 11. August 2020 17:38:20 CEST


This is all the information about APD 2708030632. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2708030632
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B03
Break-through voltage: 412 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 6.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 80
Position in Box: 44
EP1 batch: 66
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.8827441 V     T = -25 °C: 347.4547953 V
Voltage for Gain 150: T = +20 °C: 390.8032995 V     T = -25 °C: 354.9150361 V
Voltage for Gain 200: T = +20 °C: 395.2139682 V     T = -25 °C: 359.1003852 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.601654952 V-1     T = -25 °C: 4.701089454 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.082572084 V-1     T = -25 °C: 9.47128075 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.08851265 V-1     T = -25 °C: 14.96787427 V-1
Break-through voltage: T = +20 °C: 410.3619428 V     T = -25 °C: 374.6613287 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:58:41 CET jreher Updated box and position via API.
03. Feb 2021 18:24:12 CET jreher Updated box and position via API.
11. Aug 2020 17:38:20 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:43:01 CET jreher Updated APD location via API.
25. Nov 2019 17:17:17 CET jreher Updated box and position via API.
10. Sep 2019 11:21:16 CEST jgrochowski Updated APD batch assignment via API.
04. Sep 2019 11:01:59 CEST markus.moritz
25. Jul 2019 12:13:58 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:46:56 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:26 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:04:09 CEST Tobias Imported from Hamamatsu datasheet.