RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2610029915 - Archived data from Tue, 11. August 2020 17:37:06 CEST


This is all the information about APD 2610029915. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2610029915
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C12
Break-through voltage: 406 V
Voltage for Gain 100 (T=+25°C): 376.9 V
Dark current: 9.4 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 72
Position in Box: 16
EP1 batch: 53
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 26. Aug 2019
Sent for analysis after irradiation: 02. Sep 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Aug 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 31. Aug 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.973972 V     T = -25 °C: 341.8979692 V
Voltage for Gain 150: T = +20 °C: 384.7424094 V     T = -25 °C: 349.1901532 V
Voltage for Gain 200: T = +20 °C: 389.0734447 V     T = -25 °C: 353.2860804 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.682917206 V-1     T = -25 °C: 5.026472648 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.26472925 V-1     T = -25 °C: 9.420862623 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.4679709 V-1     T = -25 °C: 14.89492336 V-1
Break-through voltage: T = +20 °C: 404.7351433 V     T = -25 °C: 368.5472203 V
   
Notes:


Version history

Time Author Change comment
16. Nov 2021 09:32:01 CET oafedulidis Assigned to capsule by script
17. May 2021 09:15:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:57:33 CET jreher Updated box and position via API.
03. Feb 2021 18:23:06 CET jreher Updated box and position via API.
11. Aug 2020 17:37:06 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:41:30 CET jreher Updated APD location via API.
25. Nov 2019 17:16:37 CET jreher Updated box and position via API.
06. Sep 2019 13:09:37 CEST spankonin Updated APD batch assignment via API.
02. Sep 2019 12:11:22 CEST markus.moritz
08. Jul 2019 14:54:06 CEST spankonin Updated APD batch assignment via API.
05. Jul 2019 13:45:51 CEST jreher Updated APD location via API.
03. Jan 2019 00:13:10 CET Tobias Corrected dark current unit.
24. May 2018 14:39:23 CEST Tobias Updated location to "Bochum".
18. May 2018 12:01:31 CEST Tobias Imported from Hamamatsu datasheet.