RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2404026155 - Archived data from Fri, 05. February 2021 10:48:33 CET


This is all the information about APD 2404026155. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2404026155
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 379.5 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 40
Position in Box: 32
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 21. Sep 2018
Sent for analysis after irradiation: 02. Oct 2018
Return for assembly: none
   
Irradiation:  
Date: 27. Sep 2018
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: 28. Sep 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.4808784 V     T = -25 °C: 344.5496037 V
Voltage for Gain 150: T = +20 °C: 387.2946185 V     T = -25 °C: 351.8180699 V
Voltage for Gain 200: T = +20 °C: 391.6729394 V     T = -25 °C: 355.946054 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.042375428 V-1     T = -25 °C: 4.522445453 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.919953343 V-1     T = -25 °C: 8.951444311 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.71240815 V-1     T = -25 °C: 15.00799386 V-1
Break-through voltage: T = +20 °C: 407.681289 V     T = -25 °C: 371.5748258 V
   
Notes: sent to Bochum on 26_11_2018


Version history

Time Author Change comment
16. Nov 2021 09:41:58 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:38 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:58:56 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:45 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:53:23 CET jreher Updated box and position via API.
05. Feb 2021 10:48:33 CET jreher Updated box and position via API.
03. Feb 2021 18:19:09 CET jreher Updated box and position via API.
03. Feb 2021 18:14:47 CET jreher Updated box and position via API.
11. Aug 2020 17:26:15 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:30:37 CET jreher Updated APD location via API.
25. Nov 2019 17:14:04 CET jreher Updated box and position via API.
25. Nov 2019 17:11:27 CET jreher Updated box and position via API.
04. Jul 2019 11:05:46 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:20 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:12:48 CET Tobias Corrected dark current unit.
27. Nov 2018 15:02:42 CET markus.moritz
02. Oct 2018 13:50:52 CEST markus.moritz
26. Sep 2018 11:55:38 CEST markus.moritz
12. Jan 2018 13:16:48 CET Tobias Imported from Hamamatsu datasheet.