RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2515028662


This is all the information about APD 2515028662. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2515028662
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2515028662/0807007709
Unit: #1805 (barcode 1309018772)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: F03
Break-through voltage: 408 V
Voltage for Gain 100 (T=+25°C): 380 V
Dark current: 4 nA
   
Screening Logistics:  
Available: No
Storage Box: 61
Position in Box: 26
EP1 batch: 37
EP1 batch after irradiation: 10126
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jul 2019
Sent for analysis after irradiation: 19. Jul 2019
Return for assembly: none
   
Irradiation:  
Date: 16. Jul 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 17. Jul 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 379.2312107 V     T = -25 °C: 344.3581099 V
Voltage for Gain 150: T = +20 °C: 387.1796923 V     T = -25 °C: 351.7587205 V
Voltage for Gain 200: T = +20 °C: 391.6187415 V     T = -25 °C: 355.9049656 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.66936278 V-1     T = -25 °C: 4.870122796 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.973905124 V-1     T = -25 °C: 9.073783275 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.19933112 V-1     T = -25 °C: 16.69675119 V-1
Break-through voltage: T = +20 °C: 407.5518485 V     T = -25 °C: 371.3878769 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
15. Feb 2021 15:38:15 CET jreher Assigned to capsule by script
05. Feb 2021 10:56:12 CET jreher Updated box and position via API.
03. Feb 2021 18:21:46 CET jreher Updated box and position via API.
18. Dec 2020 13:59:53 CET jreher Updated box and position via API.
11. Aug 2020 17:32:36 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:39:32 CET jreher Updated APD location via API.
25. Nov 2019 17:15:42 CET jreher Updated box and position via API.
01. Aug 2019 12:13:06 CEST spankonin Updated APD batch assignment via API.
24. Jul 2019 10:21:19 CEST markus.moritz
12. Jul 2019 13:55:39 CEST jreher Updated APD location via API.
01. Jul 2019 14:26:54 CEST spankonin Updated APD batch assignment via API.
03. Jan 2019 00:12:28 CET Tobias Corrected dark current unit.
12. Jan 2018 13:12:10 CET Tobias Imported from Hamamatsu datasheet.