RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2420027517 - Archived data from Tue, 11. August 2020 17:24:04 CEST


This is all the information about APD 2420027517. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2420027517
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D08
Break-through voltage: 405 V
Voltage for Gain 100 (T=+25°C): 375.9 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 27
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 16. Jan 2019
Sent for analysis after irradiation: 28. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 21. Jan 2019
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 22. Jan 2019
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 376.1404641 V     T = -25 °C: 341.4954653 V
Voltage for Gain 150: T = +20 °C: 384.0031333 V     T = -25 °C: 348.7607937 V
Voltage for Gain 200: T = +20 °C: 388.3243994 V     T = -25 °C: 352.7661971 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.60804784 V-1     T = -25 °C: 4.470066369 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.80412195 V-1     T = -25 °C: 9.198260289 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.51525182 V-1     T = -25 °C: 16.70307492 V-1
Break-through voltage: T = +20 °C: 403.8159924 V     T = -25 °C: 367.8788043 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:09:41 CEST oafedulidis Assigned to capsule by script
15. Apr 2021 17:01:29 CEST jreher Updated box and position via API.
05. Feb 2021 10:51:18 CET jreher Updated box and position via API.
03. Feb 2021 18:17:24 CET jreher Updated box and position via API.
11. Aug 2020 17:24:04 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:15 CET jreher Updated APD location via API.
25. Nov 2019 17:12:59 CET jreher Updated box and position via API.
04. Jul 2019 11:09:52 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:24 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:19 CEST jreher Updated APD batch assignment via API.
28. Jan 2019 11:56:37 CET markus.moritz
03. Jan 2019 00:11:56 CET Tobias Corrected dark current unit.
12. Jan 2018 13:11:54 CET Tobias Imported from Hamamatsu datasheet.