RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 2412026904


This is all the information about APD 2412026904. If it is wrong, edit the data.

Subdetector specification:  
Serial: 2412026904
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 2412026904/2505027932
Unit: #2826 (barcode 1309025015)
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: G12
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 388.5 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: No
Storage Box: 28
Position in Box: 1
EP1 batch: none
EP1 batch after irradiation: 10045
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: 12. Nov 2018
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 388.3757322 V     T = -25 °C: 352.3388714 V
Voltage for Gain 150: T = +20 °C: 396.2190427 V     T = -25 °C: 359.9010029 V
Voltage for Gain 200: T = +20 °C: 400.573276 V     T = -25 °C: 364.0936712 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.39083026 V-1     T = -25 °C: 4.773650252 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.391727272 V-1     T = -25 °C: 8.812105305 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.92686382 V-1     T = -25 °C: 14.39490834 V-1
Break-through voltage: T = +20 °C: 415.6586227 V     T = -25 °C: 379.3457724 V
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
16. Nov 2021 09:31:00 CET oafedulidis Assigned to capsule by script
15. Apr 2021 17:00:55 CEST jreher Updated box and position via API.
05. Feb 2021 10:51:24 CET jreher Updated box and position via API.
03. Feb 2021 18:17:31 CET jreher Updated box and position via API.
11. Aug 2020 17:24:12 CEST jreher Updated APD characteristics via API.
27. Nov 2019 19:34:26 CET jreher Updated APD location via API.
25. Nov 2019 17:13:03 CET jreher Updated box and position via API.
04. Jul 2019 11:09:59 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:28 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:23 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 00:11:38 CET Tobias Corrected dark current unit.
26. Nov 2018 13:41:29 CET markus.moritz
16. Nov 2018 15:13:08 CET markus.moritz
12. Jan 2018 13:11:45 CET Tobias Imported from Hamamatsu datasheet.