RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0608004648


This is all the information about APD 0608004648. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0608004648
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Giessen (mounted in Slice)
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 444 V
Voltage for Gain 100 (T=+25°C): 415.7 V
Dark current: 15.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: none
Position in Box: none
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 305
Position in grid: 0
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Characteristics

Temperature Measurement Notes
No characteristics available!


Upload new characteristic...

Progression of the current during irradiation

Upload time Notes
No data available!


Upload new progression data...

Version history

Time Author Change comment
17. Apr 2021 01:09:28 CEST jreher Updated APD location via API.
14. Nov 2019 17:13:51 CET jreher Removed faulty data
14. Nov 2019 17:13:27 CET jreher Removed faulty data
14. Nov 2019 17:12:46 CET jreher Removed faulty data
14. Nov 2019 17:10:26 CET jreher Removed faulty data
14. Nov 2019 17:06:05 CET jreher Updated date sent for analysis after screening via API.
14. Nov 2019 17:05:37 CET jreher Updated arrival for irradiation via API.
14. Nov 2019 17:04:59 CET jreher Updated irradiation info via API.
14. Nov 2019 17:04:23 CET jreher Updated annealing info via API.
14. Nov 2019 13:59:15 CET jreher Undid incorrect change via API
14. Nov 2019 13:57:52 CET jreher Updated APD location via API.
21. Nov 2016 17:44:51 CET Tobias Assigned to grid via information extracted from APD DB.
21. Nov 2016 17:06:02 CET tobias Manually added based on APD lab DB export.