Show Hamamatsu Avalanche Photo Diode 2007021983 - Archived data from Mon, 17. May 2021 09:16:20 CEST
This is all the information about APD 2007021983. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 2007021983 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | G09 |
| Break-through voltage: | 404 V |
| Voltage for Gain 100 (T=+25°C): | 377.1 V |
| Dark current: | 15.3 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 235 |
| Position in Box: | 29 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | none |
| Position in grid: | none |
| Arrival for irradiation: | 21. Aug 2019 |
| Sent for analysis after irradiation: | 15. Oct 2019 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 09. Oct 2019 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 12. Oct 2019 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: 377.1385579 V T = -25 °C: 342.9589439 V |
| Voltage for Gain 150: | T = +20 °C: 384.8877287 V T = -25 °C: 350.1808816 V |
| Voltage for Gain 200: | T = +20 °C: 389.2332951 V T = -25 °C: 354.2526004 V |
| Gain/Voltage slope at M = 100: | T = +20 °C: 4.615012556 V-1 T = -25 °C: 5.025455084 V-1 |
| Gain/Voltage slope at M = 150: | T = +20 °C: 9.027874197 V-1 T = -25 °C: 9.405221155 V-1 |
| Gain/Voltage slope at M = 200: | T = +20 °C: 13.98242896 V-1 T = -25 °C: 14.84378898 V-1 |
| Break-through voltage: | T = +20 °C: 403.7200289 V T = -25 °C: 368.5051278 V |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 19. May 2022 15:26:32 CEST | oafedulidis | Assigned to capsule by script |
| 17. May 2021 09:16:20 CEST | oafedulidis | Updated box and position via API. |
| 05. Feb 2021 11:18:36 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:40:57 CEST | jreher | Updated APD characteristics via API. |
| 21. Jul 2020 14:30:10 CEST | jreher | Updated box and position via API. |
| 16. Jan 2020 12:06:27 CET | jreher | Updated date sent for analysis after screening via API. |
| 16. Jan 2020 12:04:37 CET | jreher | Updated annealing info via API. |
| 16. Jan 2020 12:01:47 CET | jreher | Updated irradiation info via API. |
| 16. Jan 2020 11:58:55 CET | jreher | Updated arrival for irradiation via API. |
| 16. Jan 2020 11:58:01 CET | jreher | Updated arrival for irradiation via API. |
| 27. Nov 2019 20:10:40 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:29:09 CET | jreher | Updated box and position via API. |
| 22. Oct 2019 12:49:11 CEST | spankonin | Updated APD location via API. |
| 18. Oct 2019 13:56:20 CEST | jgrochowski | Updated APD batch assignment via API. |
| 23. Jun 2016 11:52:49 CEST | Tobias | Imported from Hamamatsu datasheet. |