RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1620018347 - Archived data from Tue, 11. August 2020 17:58:08 CEST


This is all the information about APD 1620018347. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1620018347
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B06
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 394.2 V
Dark current: 4.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 306
Position in Box: 5
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 494
Position in grid: 6
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 394.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.2105878 V     T = -25 °C: 358.0192027 V
Voltage for Gain 150: T = +20 °C: 402.1956785 V     T = -25 °C: 365.7484646 V
Voltage for Gain 200: T = +20 °C: 406.6358349 V     T = -25 °C: 370.0762607 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.48372474 V-1     T = -25 °C: 4.720055862 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.665008247 V-1     T = -25 °C: 9.291297734 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12710999 V-1     T = -25 °C: 14.55407658 V-1
Break-through voltage: T = +20 °C: 418.5187194 V     T = -25 °C: 385.6453258 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:06:18 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:56 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:20 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:59 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:45 CET jreher Updated box and position via API.
11. Aug 2020 17:58:08 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:44:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:44:14 CEST jreher Updated box and position via API.
19. Dec 2019 16:33:48 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:35 CET jreher Updated box and position via API.
10. Nov 2017 09:39:51 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:37:50 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:10:49 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:52 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:41:05 CEST Tobias Imported from Hamamatsu datasheet.