RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1619018260 - Archived data from Fri, 05. February 2021 11:27:03 CET


This is all the information about APD 1619018260. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1619018260
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B07
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387.2 V
Dark current: 3.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 47
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 484
Position in grid: 13
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 387.2 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.1728714 V     T = -25 °C: 351.4501354 V
Voltage for Gain 150: T = +20 °C: 395.1670857 V     T = -25 °C: 359.2615564 V
Voltage for Gain 200: T = +20 °C: 399.6131173 V     T = -25 °C: 363.5739757 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.451377619 V-1     T = -25 °C: 4.747390701 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.631742584 V-1     T = -25 °C: 6.115358457 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.01316782 V-1     T = -25 °C: 15.74028311 V-1
Break-through voltage: T = +20 °C: 413.0585281 V     T = -25 °C: 378.8761943 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:17:03 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:01:37 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:03 CET jreher Updated box and position via API.
11. Aug 2020 17:57:15 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:57 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:47 CEST jreher Updated box and position via API.
19. Dec 2019 15:53:11 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:53 CET jreher Updated box and position via API.
17. Nov 2017 09:39:57 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:49 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:10:42 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:52 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:41:02 CEST Tobias Imported from Hamamatsu datasheet.