RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1618018229 - Archived data from Tue, 11. August 2020 17:57:13 CEST


This is all the information about APD 1618018229. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1618018229
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: A10
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 390 V
Dark current: 3.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 300
Position in Box: 37
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 484
Position in grid: 3
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 390 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.5571226 V     T = -25 °C: 353.4161885 V
Voltage for Gain 150: T = +20 °C: 397.5194731 V     T = -25 °C: 361.3174218 V
Voltage for Gain 200: T = +20 °C: 401.9262116 V     T = -25 °C: 365.526434 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.348022365 V-1     T = -25 °C: 4.569625507 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.224445337 V-1     T = -25 °C: 8.183977878 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.35776593 V-1     T = -25 °C: 15.96857798 V-1
Break-through voltage: T = +20 °C: 411.053139 V     T = -25 °C: 380.2670559 V
   
Notes:


Version history

Time Author Change comment
26. Oct 2021 10:49:30 CEST oafedulidis Assigned to capsule by script
10. May 2021 14:00:34 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:02 CET jreher Updated box and position via API.
11. Aug 2020 17:57:13 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:56 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:47 CEST jreher Updated box and position via API.
19. Dec 2019 15:53:10 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:52 CET jreher Updated box and position via API.
17. Nov 2017 09:39:57 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:49 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:10:42 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:52 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 11:41:02 CEST Tobias Imported from Hamamatsu datasheet.