RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0712006365 - Archived data from Tue, 11. August 2020 17:56:38 CEST


This is all the information about APD 0712006365. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0712006365
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: G08
Break-through voltage: 411 V
Voltage for Gain 100 (T=+25°C): 383 V
Dark current: 15.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 297
Position in Box: 8
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 51
Position in grid: 3
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 383 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 382.4996653 V     T = -25 °C: 346.9587063 V
Voltage for Gain 150: T = +20 °C: 390.3696207 V     T = -25 °C: 354.3766667 V
Voltage for Gain 200: T = +20 °C: 394.7383074 V     T = -25 °C: 358.5495508 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.426751011 V-1     T = -25 °C: 4.906662102 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.636575768 V-1     T = -25 °C: 9.078146422 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.99005325 V-1     T = -25 °C: 16.02885521 V-1
Break-through voltage: T = +20 °C: 409.4624728 V     T = -25 °C: 373.778376 V
   
Notes:


Version history

Time Author Change comment
11. Jul 2022 14:25:09 CEST oafedulidis Assigned to capsule by script
03. May 2021 15:19:26 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:35 CET jreher Updated box and position via API.
11. Aug 2020 17:56:38 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:46:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:01 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:07 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:27 CET jreher Updated box and position via API.
23. Aug 2017 15:53:42 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:48 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:52 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:43:41 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:58 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:09 CEST Tobias Imported from Hamamatsu datasheet.