RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0712006364 - Archived data from Tue, 11. August 2020 17:46:11 CEST


This is all the information about APD 0712006364. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0712006364
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 409 V
Voltage for Gain 100 (T=+25°C): 380.8 V
Dark current: 11.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 297
Position in Box: 7
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 51
Position in grid: 1
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 2
Bias voltage: 380.8 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 380.896095 V     T = -25 °C: 345.5737424 V
Voltage for Gain 150: T = +20 °C: 388.741942 V     T = -25 °C: 352.8972626 V
Voltage for Gain 200: T = +20 °C: 393.0983932 V     T = -25 °C: 357.0117744 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.612398161 V-1     T = -25 °C: 4.743946427 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.14589209 V-1     T = -25 °C: 9.565212795 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.26490119 V-1     T = -25 °C: 15.19259596 V-1
Break-through voltage: T = +20 °C: 407.0971857 V     T = -25 °C: 372.1323006 V
   
Notes:


Version history

Time Author Change comment
27. Oct 2021 14:17:48 CEST oafedulidis Assigned to capsule by script
21. Apr 2021 11:02:03 CEST jreher Updated box and position via API.
05. Feb 2021 11:26:34 CET jreher Updated box and position via API.
11. Aug 2020 17:56:37 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:46:11 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:42:10 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:01 CEST jreher Updated box and position via API.
19. Dec 2019 15:48:06 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:27 CET jreher Updated box and position via API.
23. Aug 2017 15:53:42 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:48 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:52 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:43:41 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:58 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:09 CEST Tobias Imported from Hamamatsu datasheet.