RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1612017711 - Archived data from Tue, 11. August 2020 17:57:19 CEST


This is all the information about APD 1612017711. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1612017711
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C06
Break-through voltage: 422 V
Voltage for Gain 100 (T=+25°C): 393.5 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 301
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 465
Position in grid: 16
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 393.5 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.2023852 V     T = -25 °C: 357.4755812 V
Voltage for Gain 150: T = +20 °C: 402.1691341 V     T = -25 °C: 365.2229575 V
Voltage for Gain 200: T = +20 °C: 406.5954725 V     T = -25 °C: 369.5713463 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.472780113 V-1     T = -25 °C: 4.555896895 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.736517584 V-1     T = -25 °C: 8.874998169 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.12102428 V-1     T = -25 °C: 15.38395769 V-1
Break-through voltage: T = +20 °C: 422.2567874 V     T = -25 °C: 385.3213217 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:08 CET jreher Updated box and position via API.
11. Aug 2020 17:57:19 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:09 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:59 CEST jreher Updated box and position via API.
19. Dec 2019 15:54:11 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:58 CET jreher Updated box and position via API.
17. Nov 2017 09:39:50 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:37 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:12:20 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:56 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:45:35 CEST Tobias Imported from Hamamatsu datasheet.