RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1612017709 - Archived data from Tue, 11. August 2020 17:57:19 CEST


This is all the information about APD 1612017709. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1612017709
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F04
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392.3 V
Dark current: 5.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 301
Position in Box: 17
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 465
Position in grid: 14
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 17. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 16. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 3
Bias voltage: 392.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 392.6526711 V     T = -25 °C: 356.6497981 V
Voltage for Gain 150: T = +20 °C: 400.6601896 V     T = -25 °C: 364.3210057 V
Voltage for Gain 200: T = +20 °C: 405.0890365 V     T = -25 °C: 368.6339326 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.34254374 V-1     T = -25 °C: 4.559476976 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.38320333 V-1     T = -25 °C: 8.959673084 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.38933253 V-1     T = -25 °C: 15.75371117 V-1
Break-through voltage: T = +20 °C: 420.5429306 V     T = -25 °C: 384.1693408 V
   
Notes:


Version history

Time Author Change comment
10. Jun 2022 12:28:51 CEST oafedulidis Assigned to capsule by script
30. Aug 2021 14:08:16 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:27:08 CET jreher Updated box and position via API.
11. Aug 2020 17:57:19 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:09 CEST jreher Updated APD location via API.
21. Jul 2020 14:42:59 CEST jreher Updated box and position via API.
19. Dec 2019 15:54:10 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:58 CET jreher Updated box and position via API.
17. Nov 2017 09:39:50 CET markus.moritz Entered shipped after irradiation date.
17. Nov 2017 09:38:37 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:12:20 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:56 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:45:35 CEST Tobias Imported from Hamamatsu datasheet.