RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0711006298 - Archived data from Fri, 05. February 2021 11:26:30 CET


This is all the information about APD 0711006298. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0711006298
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F10
Break-through voltage: 420 V
Voltage for Gain 100 (T=+25°C): 391.1 V
Dark current: 10.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 296
Position in Box: 28
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 46
Position in grid: 8
Arrival for irradiation: 03. Aug 2017
Sent for analysis after irradiation: 23. Aug 2017
Return for assembly: none
   
Irradiation:  
Date: 11. Aug 2017
Dose used: 46 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 391.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.3019466 V     T = -25 °C: 355.0197927 V
Voltage for Gain 150: T = +20 °C: 399.1207302 V     T = -25 °C: 362.5219677 V
Voltage for Gain 200: T = +20 °C: 403.4629251 V     T = -25 °C: 366.7174416 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.482043973 V-1     T = -25 °C: 4.790632209 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.835541472 V-1     T = -25 °C: 9.716372549 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.45882719 V-1     T = -25 °C: 15.3767921 V-1
Break-through voltage: T = +20 °C: 418.7851442 V     T = -25 °C: 382.2117675 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 14:48:06 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:26:30 CET jreher Updated box and position via API.
11. Aug 2020 17:56:33 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:41:58 CEST jreher Updated APD location via API.
21. Jul 2020 14:41:48 CEST jreher Updated box and position via API.
19. Dec 2019 15:47:38 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:17:21 CET jreher Updated box and position via API.
23. Aug 2017 15:54:04 CEST markus.moritz Entered shipped after irradiation date.
11. Aug 2017 14:10:09 CEST hans-georg.zaunick Entered irradiation information.
11. Aug 2017 12:58:49 CEST hans-georg.zaunick Entered irradiation information.
07. Aug 2017 16:52:30 CEST hans-georg.zaunick Entered arrival for irradiation date.
07. Aug 2017 16:42:40 CEST hans-georg.zaunick Entered arrival for irradiation date.
04. Aug 2017 03:14:56 CEST Tobias Assigned to grid via information extracted from APD DB.
22. Jun 2016 15:13:08 CEST Tobias Imported from Hamamatsu datasheet.