RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1604017028 - Archived data from Tue, 11. August 2020 17:57:24 CEST


This is all the information about APD 1604017028. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1604017028
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C05
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 389.3 V
Dark current: 6.1 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 301
Position in Box: 40
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 439
Position in grid: 1
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 389.3 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.5491854 V     T = -25 °C: 353.2978827 V
Voltage for Gain 150: T = +20 °C: 397.4798973 V     T = -25 °C: 360.9240997 V
Voltage for Gain 200: T = +20 °C: 401.8684324 V     T = -25 °C: 365.1520334 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.367944225 V-1     T = -25 °C: 4.512919601 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.494627113 V-1     T = -25 °C: 9.471862005 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.67419225 V-1     T = -25 °C: 14.43005909 V-1
Break-through voltage: T = +20 °C: 418.8260021 V     T = -25 °C: 381.7207705 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:10 CET jreher Updated box and position via API.
11. Aug 2020 17:57:24 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:11 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:01 CEST jreher Updated box and position via API.
19. Dec 2019 16:18:42 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:00 CET jreher Updated box and position via API.
10. Nov 2017 09:39:43 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:38:15 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:44 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:55 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:23 CEST Tobias Imported from Hamamatsu datasheet.