RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1603016923 - Archived data from Fri, 05. February 2021 11:29:54 CET


This is all the information about APD 1603016923. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1603016923
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: F07
Break-through voltage: 417 V
Voltage for Gain 100 (T=+25°C): 388.8 V
Dark current: 6.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 324
Position in Box: 22
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 389.4966384 V     T = -25 °C: 352.6381386 V
Voltage for Gain 150: T = +20 °C: 397.3239675 V     T = -25 °C: 358.8635769 V
Voltage for Gain 200: T = +20 °C: 401.663267 V     T = -25 °C: 364.0487666 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.461295058 V-1     T = -25 °C: 12.65523507 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.772711564 V-1     T = -25 °C: 7.441573462 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.37163276 V-1     T = -25 °C: 18.11099648 V-1
Break-through voltage: T = +20 °C: 413.803159 V     T = -25 °C: 380.4475336 V
   
Notes:


Version history

Time Author Change comment
21. Apr 2021 12:56:58 CEST jreher Updated box and position via API.
05. Feb 2021 11:29:54 CET jreher Updated box and position via API.
06. Oct 2020 19:10:01 CEST jreher Updated APD batch assignment via API.
11. Aug 2020 18:10:28 CEST jreher Updated APD characteristics via API.
11. Aug 2020 17:53:19 CEST jreher Updated APD location via API.
21. Jul 2020 16:15:58 CEST jreher Updated APD batch assignment via API.
23. Jun 2016 10:42:21 CEST Tobias Imported from Hamamatsu datasheet.