RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1503016711 - Archived data from Wed, 03. February 2021 18:18:21 CET


This is all the information about APD 1503016711. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1503016711
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: B04
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 387 V
Dark current: 3.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 34
Position in Box: 25
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 425
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.8944742 V     T = -25 °C: 350.8727251 V
Voltage for Gain 150: T = +20 °C: 394.8324594 V     T = -25 °C: 358.4061444 V
Voltage for Gain 200: T = +20 °C: 399.2950134 V     T = -25 °C: 362.6756594 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.615191226 V-1     T = -25 °C: 4.731421191 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.210341466 V-1     T = -25 °C: 8.92985696 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.26856514 V-1     T = -25 °C: 14.77381416 V-1
Break-through voltage: T = +20 °C: 414.2632831 V     T = -25 °C: 378.1599346 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:52:15 CET jreher Updated box and position via API.
03. Feb 2021 18:18:21 CET jreher Updated box and position via API.
11. Aug 2020 17:25:13 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:37 CET jreher Updated APD location via API.
25. Nov 2019 17:13:34 CET jreher Updated box and position via API.
13. Jun 2019 11:29:15 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:56 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:52 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 14:54:44 CET markus.moritz
29. Sep 2017 13:44:34 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:50 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:16 CEST Tobias Imported from Hamamatsu datasheet.