Show Hamamatsu Avalanche Photo Diode 1503016704 - Archived data from Wed, 03. February 2021 18:19:03 CET


This is all the information about APD 1503016704. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1503016704
Type: Hamamatsu Avalanche Photo Diode
Detector: assigned to 1503016704/0804007469
Unit: #862 (barcode 1309009459)
Preamp: 4433
Current location: Bochum
   
Installation information:  
Label: blue
   
Manufacturer information:  
Wafer position: A06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 388.1 V
Dark current: 3.4 nA
   
Screening Logistics:  
Available: No
Storage Box: 39
Position in Box: 45
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 424
Position in grid: 17
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 16. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 28. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 30. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 387.8496555 V     T = -25 °C: 351.6906389 V
Voltage for Gain 150: T = +20 °C: 395.8202352 V     T = -25 °C: 359.3033466 V
Voltage for Gain 200: T = +20 °C: 400.2488415 V     T = -25 °C: 363.5955953 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.410017371 V-1     T = -25 °C: 4.702813011 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 9.137493856 V-1     T = -25 °C: 9.072709056 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.82945708 V-1     T = -25 °C: 15.27201678 V-1
Break-through voltage: T = +20 °C: 412.8197225 V     T = -25 °C: 377.707758 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:53:17 CET jreher Updated box and position via API.
03. Feb 2021 18:19:03 CET jreher Updated box and position via API.
11. Aug 2020 17:26:07 CEST jreher Updated APD characteristics via API.
13. Feb 2020 14:42:52 CET jreher Updated box and position via API.
27. Nov 2019 19:35:55 CET jreher Updated APD location via API.
25. Nov 2019 17:14:00 CET jreher Updated box and position via API.
17. Oct 2019 14:09:02 CEST tholtmann Assigned to unit by script
17. Oct 2019 13:53:07 CEST tholtmann Assigned to capsule by script
04. Jul 2019 11:10:56 CEST jreher Updated APD location via API.
12. Jun 2019 16:48:21 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:33:17 CEST jreher Updated APD batch assignment via API.
18. Jan 2019 14:36:41 CET markus.moritz
03. Dec 2018 11:31:31 CET markus.moritz
29. Sep 2017 11:55:32 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:50 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:16 CEST Tobias Imported from Hamamatsu datasheet.