RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1502016620 - Archived data from Tue, 11. August 2020 17:24:44 CEST


This is all the information about APD 1502016620. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1502016620
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D11
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 393.8 V
Dark current: 4.3 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 31
Position in Box: 27
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 423
Position in grid: 1
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Jan 2019
Return for assembly: none
   
Irradiation:  
Date: 05. Dec 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 10. Dec 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 394.6768987 V     T = -25 °C: 358.1409372 V
Voltage for Gain 150: T = +20 °C: 402.5768436 V     T = -25 °C: 365.839748 V
Voltage for Gain 200: T = +20 °C: 406.9596559 V     T = -25 °C: 370.1464838 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.529679279 V-1     T = -25 °C: 4.538581142 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.733910677 V-1     T = -25 °C: 8.675516809 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.70769735 V-1     T = -25 °C: 14.61949321 V-1
Break-through voltage: T = +20 °C: 421.8591382 V     T = -25 °C: 385.3265007 V
   
Notes:


Version history

Time Author Change comment
19. Nov 2021 13:06:14 CET oafedulidis Assigned to capsule by script
16. Jun 2021 16:02:55 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:59:19 CEST oafedulidis Updated box and position via API.
16. Jun 2021 15:51:58 CEST oafedulidis Updated box and position via API.
05. Feb 2021 10:51:52 CET jreher Updated box and position via API.
03. Feb 2021 18:17:57 CET jreher Updated box and position via API.
11. Aug 2020 17:24:44 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:04 CET jreher Updated APD location via API.
25. Nov 2019 17:13:19 CET jreher Updated box and position via API.
13. Jun 2019 11:28:33 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:43 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:38 CEST jreher Updated APD batch assignment via API.
03. Jan 2019 13:07:57 CET markus.moritz
29. Sep 2017 14:10:19 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:48 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:42:14 CEST Tobias Imported from Hamamatsu datasheet.