RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1502016610 - Archived data from Tue, 11. August 2020 17:57:38 CEST


This is all the information about APD 1502016610. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1502016610
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: D12
Break-through voltage: 425 V
Voltage for Gain 100 (T=+25°C): 396.4 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 11
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 422
Position in grid: 11
Arrival for irradiation: 30. Oct 2017
Sent for analysis after irradiation: 10. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 10. Nov 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 1
Bias voltage: 396.4 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 397.0193648 V     T = -25 °C: 360.3562477 V
Voltage for Gain 150: T = +20 °C: 404.9758629 V     T = -25 °C: 368.1257476 V
Voltage for Gain 200: T = +20 °C: 409.4003397 V     T = -25 °C: 372.4669667 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.515647074 V-1     T = -25 °C: 4.545154309 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.820934763 V-1     T = -25 °C: 8.844075076 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.3445738 V-1     T = -25 °C: 15.44731553 V-1
Break-through voltage: T = +20 °C: 424.8655067 V     T = -25 °C: 388.2624708 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:23 CET jreher Updated box and position via API.
07. Oct 2020 15:45:01 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:38 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:40 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:30 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:19 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:13 CET jreher Updated box and position via API.
10. Nov 2017 09:39:20 CET markus.moritz Entered shipped after irradiation date.
10. Nov 2017 09:37:32 CET markus.moritz Entered irradiation information.
09. Nov 2017 15:11:33 CET markus.moritz Entered arrival for irradiation date.
02. Nov 2017 15:16:55 CET Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:04 CEST Tobias Imported from Hamamatsu datasheet.