Show Hamamatsu Avalanche Photo Diode 1502016593 - Archived data from Thu, 13. June 2019 11:28:33 CEST
This is all the information about APD 1502016593. If it is wrong, edit the data.
| Subdetector specification: | |
|---|---|
| Serial: | 1502016593 |
| Type: | Hamamatsu Avalanche Photo Diode |
| Detector: | unassigned |
| Unit: | unassigned |
| Preamp: | 0 |
| Current location: | Bochum, Box 31 |
| Installation information: | |
| Label: | none |
| Manufacturer information: | |
| Wafer position: | F06 |
| Break-through voltage: | 415 V |
| Voltage for Gain 100 (T=+25°C): | 386.4 V |
| Dark current: | 4.8 nA |
| Screening Logistics: | |
| Available: | Yes |
| Storage Box: | 31 |
| Position in Box: | 24 |
| EP1 batch: | none |
| EP1 batch after irradiation: | none |
| Shipment: | |
| Grid number: | 421 |
| Position in grid: | 16 |
| Arrival for irradiation: | 29. Sep 2017 |
| Sent for analysis after irradiation: | 26. Nov 2018 |
| Return for assembly: | none |
| Irradiation: | |
| Date: | 22. Nov 2018 |
| Dose used: | 37 Gy |
| Temperature: | 20 °C |
| Position: | none |
| Bias voltage: | none |
| Annealing: | |
| Date: | 23. Nov 2018 |
| Temperature: | 80 °C |
| Duration: | 48 h |
| Measurement results: | |
| Voltage for Gain 100: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 150: | T = +20 °C: none T = -25 °C: none |
| Voltage for Gain 200: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 100: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 150: | T = +20 °C: none T = -25 °C: none |
| Gain/Voltage slope at M = 200: | T = +20 °C: none T = -25 °C: none |
| Break-through voltage: | T = +20 °C: none T = -25 °C: none |
| Notes: |
Version history
| Time | Author | Change comment |
|---|---|---|
| 05. Feb 2021 10:51:51 CET | jreher | Updated box and position via API. |
| 03. Feb 2021 18:17:57 CET | jreher | Updated box and position via API. |
| 11. Aug 2020 17:24:43 CEST | jreher | Updated APD characteristics via API. |
| 28. Nov 2019 12:22:03 CET | jreher | Updated APD location via API. |
| 25. Nov 2019 17:13:19 CET | jreher | Updated box and position via API. |
| 13. Jun 2019 11:28:33 CEST | jreher | Updated APD location via API. |
| 12. Jun 2019 16:47:43 CEST | jreher | Updated APD batch assignment via API. |
| 12. Jun 2019 16:32:38 CEST | jreher | Updated APD batch assignment via API. |
| 26. Nov 2018 15:28:17 CET | markus.moritz | |
| 29. Sep 2017 13:48:04 CEST | markus.moritz | Entered arrival for irradiation date. |
| 01. Aug 2016 17:29:48 CEST | Tobias | Assigned to grid via information extracted from APD DB. |
| 23. Jun 2016 10:41:03 CEST | Tobias | Imported from Hamamatsu datasheet. |