RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1502016588 - Archived data from Tue, 11. August 2020 17:24:42 CEST


This is all the information about APD 1502016588. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1502016588
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E06
Break-through voltage: 414 V
Voltage for Gain 100 (T=+25°C): 385.5 V
Dark current: 4.7 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 31
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 421
Position in grid: 11
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 26. Nov 2018
Return for assembly: none
   
Irradiation:  
Date: 22. Nov 2018
Dose used: 37 Gy
Temperature: 20 °C
Position: none
Bias voltage: none     
   
Annealing:  
Date: 23. Nov 2018
Temperature: 80 °C
Duration: 48 h
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 385.8386595 V     T = -25 °C: 349.6660543 V
Voltage for Gain 150: T = +20 °C: 393.8068116 V     T = -25 °C: 357.2415484 V
Voltage for Gain 200: T = +20 °C: 398.2295523 V     T = -25 °C: 361.5282421 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.470088996 V-1     T = -25 °C: 4.760177528 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.493132309 V-1     T = -25 °C: 9.316026954 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.20673185 V-1     T = -25 °C: 14.11822844 V-1
Break-through voltage: T = +20 °C: 414.1024467 V     T = -25 °C: 377.428697 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 10:51:51 CET jreher Updated box and position via API.
03. Feb 2021 18:17:56 CET jreher Updated box and position via API.
11. Aug 2020 17:24:42 CEST jreher Updated APD characteristics via API.
28. Nov 2019 12:22:03 CET jreher Updated APD location via API.
25. Nov 2019 17:13:18 CET jreher Updated box and position via API.
13. Jun 2019 11:28:33 CEST jreher Updated APD location via API.
12. Jun 2019 16:47:42 CEST jreher Updated APD batch assignment via API.
12. Jun 2019 16:32:37 CEST jreher Updated APD batch assignment via API.
26. Nov 2018 15:24:35 CET markus.moritz
29. Sep 2017 13:48:04 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:48 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:41:03 CEST Tobias Imported from Hamamatsu datasheet.