RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1417016434 - Archived data from Tue, 11. August 2020 17:57:40 CEST


This is all the information about APD 1417016434. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1417016434
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: H08
Break-through voltage: 418 V
Voltage for Gain 100 (T=+25°C): 390.1 V
Dark current: 4.6 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 303
Position in Box: 19
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 415
Position in grid: 4
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 03. Nov 2017
Return for assembly: none
   
Irradiation:  
Date: 26. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 390.1 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.0660513 V     T = -25 °C: 355.1898599 V
Voltage for Gain 150: T = +20 °C: 399.0796624 V     T = -25 °C: 362.8431791 V
Voltage for Gain 200: T = +20 °C: 403.5358446 V     T = -25 °C: 367.1325839 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.505469748 V-1     T = -25 °C: 4.724163724 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.742468038 V-1     T = -25 °C: 9.290483352 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 15.21560672 V-1     T = -25 °C: 14.48341039 V-1
Break-through voltage: T = +20 °C: 410.3832063 V     T = -25 °C: 382.1056276 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:27:24 CET jreher Updated box and position via API.
07. Oct 2020 15:45:02 CEST jreher Updated APD location via API.
11. Aug 2020 17:57:40 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:43:41 CEST jreher Updated APD location via API.
21. Jul 2020 14:43:31 CEST jreher Updated box and position via API.
19. Dec 2019 16:19:19 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:18:13 CET jreher Updated box and position via API.
03. Nov 2017 16:13:19 CET markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:36:48 CEST markus.moritz Entered irradiation information.
29. Sep 2017 12:19:35 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:40 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:59 CEST Tobias Imported from Hamamatsu datasheet.