RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 0710006225 - Archived data from Wed, 07. October 2020 15:44:00 CEST


This is all the information about APD 0710006225. If it is wrong, edit the data.

Subdetector specification:  
Serial: 0710006225
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: In transit to Mainz
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E11
Break-through voltage: 415 V
Voltage for Gain 100 (T=+25°C): 386.6 V
Dark current: 15.8 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 211
Position in Box: 26
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: none
Position in grid: none
Arrival for irradiation: none
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 386.5999343 V     T = -25 °C: 350.8939435 V
Voltage for Gain 150: T = +20 °C: 394.4988137 V     T = -25 °C: 358.317009 V
Voltage for Gain 200: T = +20 °C: 398.8649548 V     T = -25 °C: 362.4906282 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.39046818 V-1     T = -25 °C: 4.945443729 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.528067098 V-1     T = -25 °C: 9.189647279 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 14.7089046 V-1     T = -25 °C: 16.26501606 V-1
Break-through voltage: T = +20 °C: 414.4655313 V     T = -25 °C: 377.9381185 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:15:31 CET jreher Updated box and position via API.
07. Oct 2020 15:44:00 CEST jreher Updated APD location via API.
11. Aug 2020 17:44:02 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:26:06 CEST jreher Updated box and position via API.
28. Nov 2019 13:32:24 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 13:25:21 CET spankonin Updated APD batch assignment via API.
28. Nov 2019 12:50:42 CET spankonin Updated box and position via API.
27. Nov 2019 20:06:17 CET jreher Updated APD location via API.
25. Nov 2019 17:27:18 CET jreher Updated box and position via API.
25. Nov 2019 15:23:29 CET spankonin Updated APD batch assignment via API.
31. Oct 2019 16:57:51 CET spankonin Updated APD location via API.
22. Jun 2016 15:13:06 CEST Tobias Imported from Hamamatsu datasheet.