RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1416016373 - Archived data from Tue, 21. July 2020 14:45:24 CEST


This is all the information about APD 1416016373. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1416016373
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: E09
Break-through voltage: 419 V
Voltage for Gain 100 (T=+25°C): 390.6 V
Dark current: 4.9 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 310
Position in Box: 24
EP1 batch: none
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 413
Position in grid: 0
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: 27. Oct 2017
Return for assembly: none
   
Irradiation:  
Date: 25. Oct 2017
Dose used: 45 Gy
Temperature: 20 °C
Position: 4
Bias voltage: 390.6 V     (connected)
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 150: T = +20 °C: none     T = -25 °C: none
Voltage for Gain 200: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 100: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 150: T = +20 °C: none     T = -25 °C: none
Gain/Voltage slope at M = 200: T = +20 °C: none     T = -25 °C: none
Break-through voltage: T = +20 °C: none     T = -25 °C: none
   
Notes:


Version history

Time Author Change comment
15. Nov 2022 13:06:04 CET oafedulidis Assigned to capsule by script
30. Aug 2021 14:07:24 CEST oafedulidis Updated box and position via API.
05. Feb 2021 11:28:28 CET jreher Updated box and position via API.
11. Aug 2020 17:58:51 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:45:24 CEST jreher Updated APD location via API.
21. Jul 2020 14:45:14 CEST jreher Updated box and position via API.
19. Dec 2019 16:48:21 CET spankonin Updated APD batch assignment via API.
19. Dec 2019 15:19:09 CET jreher Updated box and position via API.
27. Oct 2017 10:37:50 CEST markus.moritz Entered shipped after irradiation date.
27. Oct 2017 10:36:51 CEST markus.moritz Entered shipped after irradiation date.
26. Oct 2017 16:31:14 CEST markus.moritz Entered irradiation information.
29. Sep 2017 14:25:38 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:39 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:58 CEST Tobias Imported from Hamamatsu datasheet.