RUB » Physics » The Faculty » Chairs and Working Groups » EP1 » PANDA FEMC Production Database

Show Hamamatsu Avalanche Photo Diode 1416016330 - Archived data from Tue, 11. August 2020 18:04:07 CEST


This is all the information about APD 1416016330. If it is wrong, edit the data.

Subdetector specification:  
Serial: 1416016330
Type: Hamamatsu Avalanche Photo Diode
Detector: unassigned
Unit: unassigned
Preamp: 0
Current location: Bochum
   
Installation information:  
Label: none
   
Manufacturer information:  
Wafer position: C04
Break-through voltage: 421 V
Voltage for Gain 100 (T=+25°C): 392 V
Dark current: 7.5 nA
   
Screening Logistics:  
Available: Yes
Storage Box: 285
Position in Box: 46
EP1 batch: 204
EP1 batch after irradiation: none
   
Shipment:  
Grid number: 410
Position in grid: 18
Arrival for irradiation: 29. Sep 2017
Sent for analysis after irradiation: none
Return for assembly: none
   
Irradiation:  
Date: none
Dose used: none
Temperature: none
Position: none
Bias voltage: none     
   
Annealing:  
Date: none
Temperature: none
Duration: none
   
Measurement results:  
Voltage for Gain 100: T = +20 °C: 391.898206 V     T = -25 °C: 355.5521291 V
Voltage for Gain 150: T = +20 °C: 399.8883511 V     T = -25 °C: 363.200779 V
Voltage for Gain 200: T = +20 °C: 404.3323049 V     T = -25 °C: 367.51263 V
Gain/Voltage slope at M = 100: T = +20 °C: 4.55369975 V-1     T = -25 °C: 4.555988066 V-1
Gain/Voltage slope at M = 150: T = +20 °C: 8.92034251 V-1     T = -25 °C: 8.96719519 V-1
Gain/Voltage slope at M = 200: T = +20 °C: 13.80607302 V-1     T = -25 °C: 15.72394552 V-1
Break-through voltage: T = +20 °C: 420.0694241 V     T = -25 °C: 383.4972713 V
   
Notes:


Version history

Time Author Change comment
05. Feb 2021 11:25:08 CET jreher Updated box and position via API.
11. Aug 2020 18:04:07 CEST jreher Updated APD characteristics via API.
21. Jul 2020 14:39:54 CEST jreher Updated APD location via API.
21. Jul 2020 14:39:45 CEST jreher Updated box and position via API.
10. Feb 2020 18:57:10 CET spankonin Updated APD batch assignment via API.
29. Nov 2019 11:50:17 CET jreher Updated APD location via API.
27. Nov 2019 20:18:00 CET jreher Updated APD location via API.
25. Nov 2019 17:31:07 CET jreher Updated box and position via API.
22. Oct 2019 13:10:56 CEST spankonin Updated APD location via API.
09. Oct 2019 11:47:45 CEST jgrochowski Updated APD batch assignment via API.
29. Sep 2017 12:26:45 CEST markus.moritz Entered arrival for irradiation date.
01. Aug 2016 17:29:38 CEST Tobias Assigned to grid via information extracted from APD DB.
23. Jun 2016 10:40:57 CEST Tobias Imported from Hamamatsu datasheet.